On Thursday, May 26, 2022, a Television show for “SAINT X” is scheduled to film scenes at the following locations:
 
Clive’s Cab
 ATLANTIC AVENUE between NEW YORK AVENUE and BROOKLYN AVENUE, Brooklyn (Exterior)
Description: Cab driver sleeping in cab, fare knocks on window and wakes him up, fare gets in car, car drive off. 5 pic cars drive in scene. Steam machine, atmospheric haze – steam source – smoke. 40′ technocrane. Camera rickshaw tracks actors. B.G. has 5 dogs on leash. 40 b.g.
VTU Request: No
Request: Exterior scenes: Request NYPD assistance. Permission to intermittently hold vehicular and pedestrian traffic per NYPD officer on set. Permission for ITC. Actors cross street with ITC. Camera rickshaw tracks actors. Permission to film under MTA train overpass granted by Meredith Conti of MTA 212.340.4825.
05/26/2022 01:00 PM
05/26/2022 07:00 PM
PARKING REQUESTS
Brooklyn Subway
 ST JOHNS PLACE between NOSTRAND AVENUE and NEW YORK AVENUE, Brooklyn (Exterior)
Description: Actor follows other actor down the sidewalk and watches actor enter subway station. Subway station is a set piece located on the NE corner of St Johns Pl. at Nostrand Ave. It is under 10 ft tall and free standing and will not require a DOB permit. Camera rickshaw tracks actors. B.G. has 5 dogs on leash. 40 b.g.
VTU Request: No
Request: Exterior scenes: Request NYPD assistance. Permission to intermittently hold vehicular and pedestrian traffic per NYPD officer on set. Permission for ITC. Actors cross street with ITC. 40′ technocrane. 80′ condor.
05/26/2022 06:00 PM
05/26/2022 09:00 PM
PARKING REQUESTS

  • PARK PLACE between NOSTRAND AVENUE and NEW YORK AVENUE
    • Street Side: South
    • Street Control: Full Block
  • NOSTRAND AVENUE between PARK PLACE and STERLING PLACE
    • Street Side: East
    • Street Control: 1/2 Block
  • ST JOHNS PLACE between NOSTRAND AVENUE and NEW YORK AVENUE
    • Street Side: North and South
    • Street Control: 1/2 Block
  • STERLING PLACE between NOSTRAND AVENUE and NEW YORK AVENUE
    • Street Side: South
    • Street Control: 1/2 Block
  • ST JOHNS PLACE between NOSTRAND AVENUE and ROGERS AVENUE
    • Street Side: North
    • Street Control: 1 Truck Length
Clive’s Cab 2
 NOSTRAND AVENUE between BERGEN STREET and PROSPECT PLACE, Brooklyn (Exterior)
Description: Pic car pulls up to curb, then car pulls out and drives away. 10 pic cars drive with flow of traffic in scene. Actors cross street and walk and talk in scene. Steam machine, atmospheric haze – steam source – smoke. 40′ technocrane. 80′ condor. Camera rickshaw tracks actors. B.G. has 5 dogs on leash. 40 b.g. Wetdown.
VTU Request: No
Request: Exterior scenes: Request NYPD assistance. Permission to intermittently hold vehicular and pedestrian traffic per NYPD officer on set. Permission for ITC. Actors cross street with ITC. Pic vehicle towed by insert car on Nostrand Ave btw Bergen St and Prospect Pl. Tow rig includes side, hood, and back mounts, and hostess tray.
05/26/2022 08:00 PM
05/27/2022 12:30 PM
PARKING REQUESTS

  • PROSPECT PLACE between ROGERS AVENUE and NOSTRAND AVENUE
    • Street Side: South
    • Street Control: 1 Truck Length
  • PROSPECT PLACE between NOSTRAND AVENUE and NEW YORK AVENUE
    • Street Side: South
    • Street Control: 1/4 Block
  • NOSTRAND AVENUE between BERGEN STREET and ST MARKS AVENUE
    • Street Side: West
    • Street Control: Full Block
Josh and Emily’s Apt.
688 NOSTRAND AVENUE between ST MARKS AVENUE and PROSPECT PLACE, Brooklyn (Exterior)
Description: 10p-11:30p set up. 11:30p-3a Actors walk in the rain, walk up stoop and enter building. Pic car pulls up to building, actor gets out, runs inside from the rain. Car pulls out. Camera rickshaw tracks actors. B.G. has 5 dogs on leash. 40 b.g.
VTU Request: No
Request: Exterior scenes: Request NYPD assistance. Permission to intermittently hold vehicular and pedestrian traffic per NYPD officer on set. Permission for ITC. Actors cross street with ITC. Rain FX, rain bar, water truck and hydrant permit. Steam machine, atmospheric haze – steam source – smoke. Pic car with tow rig and mounts on Nostrand Ave btw Bergen St and Prospect Pl. 40′ technocrane. 80′ condor. ALL ELEMENTS MUST BE IN PLACE NO LATER THAN 10PM.
05/26/2022 10:00 PM
05/27/2022 03:00 AM
PARKING REQUESTS

  • NOSTRAND AVENUE between ST MARKS AVENUE and PROSPECT PLACE
    • Street Side: West
    • Street Control: Full Block
  • ST MARKS AVENUE between NOSTRAND AVENUE and ROGERS AVENUE
    • Street Side: North and South
    • Street Control: 2 Truck Lengths
  • ST MARKS AVENUE between NOSTRAND AVENUE and NEW YORK AVENUE
    • Street Side: South
    • Street Control: Full Block
  • FULTON STREET between ARLINGTON PLACE and CLAVER PLACE
    • Street Side: South
    • Street Control: Full Block
  • BERGEN STREET between NOSTRAND AVENUE and NEW YORK AVENUE
    • Street Side: North
    • Street Control: 1 Truck Length
 

Permit# 649880

If you have further questions you can contact their Locations Department at (917) 326-9210
Please feel free to contact the Office of Film, Theatre and Broadcasting at 212-489-6710.
Skip to content